321 Sample Court · Crystal River, FL Sample
Every house, planned and photographed.
See how a real house we wired is tracked, from the first drawing to inspection. It takes two minutes.
Every Sharma invoice is submitted with this job link: photos, checklists, dates and inspections attached.
Plan first
Every circuit drawn before work starts.
Photos same day
See the work without driving out.
Easy trim
Any crew can find a wire in minutes.
Ready to inspect
A checklist so nothing is missed.
Opens on any phone. No login. Nothing to install.
Step 1 of 8
House page Sample
321 Sample Court
Builder
Citrus Craft Homes
Main Electrical Contractor
Sharma Electric & HVAC
Every Sharma invoice is submitted with this job link: photos, checklists, dates and inspections attached.
Job dates Sample dates
📦 Supply pick / material coordinationTue, Nov 10, 2026
Dates are examples only. On a real job they come from the builder schedule and update in the app.
Stage
✓ Rough-In & Inspection
Trim
Final
Rough-In & Inspection
🔌 Rough-in scheduleThu, Nov 12, 2026
✅ Rough inspection dateFri, Nov 13, 2026
🔄 Auto-checked · Citrus County inspections
Status: Scheduled
Last checked: Nov 2, 2026, 12:30 PM · Sample data
Rough-in photos
Taken by our crew on site.






Photo checklist · 8/8
- Meter and service
- Grounding
- Inside the panel
- Foam in holes
- Kick plates, furring strips
- UF cable in kitchen
- All 240V spots
- Neat switch boxes
Rough inspection checklist
Tap to check. Tap a group to open it.
Trim-out
After paint, the crew sets devices, lights and fans, then checks each item below. One photo per item goes on the house page.
Trim-out checklist
Sample photos

Sample photo

Sample photo

Sample photo

Sample photo

Sample photo

Sample photo

Sample photo

Sample photo

Sample photo
GFCI and outdoor outlet photos: Wikimedia Commons (CC BY-SA 4.0 / CC BY 2.5 / CC0).
Final Inspection Checklist
Tap to check. Tap a group to open it.
Where each material goes
Tap a symbol to see a sample photo.
Recessed light
Ceiling fan (large / small)
Chandelier (foyer, stair, dining)
Pendants over island
Vanity light over mirror
Smoke detector
TR receptacle (inside)
GFCI (kitchen, baths, garage)
WR receptacle, in-use cover (outside)
AC disconnect at condenser
Carflex whip to water heater
Siemens panel (garage)
- 1AC disconnectAt the outdoor condenser, within sight of the unit.
- 2Carflex whip to water heaterFlexible liquidtight conduit from the wall to the water heater.
- 3TR receptacles insideTamper-resistant receptacles in every room inside the house.
- 4WR receptacles outsideWeather-resistant receptacles with in-use covers outside.
- 5Siemens panel + scheduleEvery breaker labeled. Sample schedule below.
Sample panel schedule (from our plans)
SamplePANEL SCHEDULE — PANEL “SN” SIEMENS SN3048L1200
| PANEL | SN (DWELLING LOAD CENTER) | VOLTS | 120/240V 1PH 3W |
|---|---|---|---|
| MODEL | SIEMENS SN3048L1200 (PLUG-ON NEUTRAL) | MAINS | 200A MAIN LUGS |
| SPACES | 30 (48 CKT MAX) | MAIN OCPD | 200A IN SIEMENS MM0202B1200 METER-MAIN |
| BUS | 200A ALUMINUM | AIC | 100 KAIC ML RATING; BREAKERS 10/22 KAIC — VERIFY |
| MOUNTING | SURFACE, FURRED CMU, NEMA 1 | LOCATION | GARAGE WEST WALL |
| CKT | DESCRIPTION | WIRE | CAT. NO. | TRIP | P | LOAD VA | PH A | PH B | LOAD VA | P | TRIP | CAT. NO. | WIRE | DESCRIPTION | CKT |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| PHASE TOTALS — CONNECTED VA | 24,883 | 20,820 | CONNECTED VA: A 24,883 / B 20,820 / TOTAL 45,703 — BALANCE 16.3%. SERVICE LOAD PER 220.82 CALC. | ||||||||||||
Swipe sideways to see the full schedule. Copied from sheet E-2 of our engineered plan set. Open sheet E-2
Panel schedule follows the plan. It can change in the field, and the app is updated when it does.


